Show/Hide Right Push Menu漢堡選單漢堡選單漢堡選單
跳到主要內容區塊

訊息公告

首頁 / 訊息公告
::: :::
日期:2024-09-20

一、為什麼政大封閉好漢坡?

好漢坡邊坡水泥護欄於1136月監測結果有外移現象,且有落石等風險,為顧及人行安全、邊坡樓梯封閉並進行檢修及評估後續補強工法


二、現階段處理方式(照明於9/13改善完成)

自強五舍下方邊坡(好漢坡)出入口已封閉,欲往自強宿舍及山下校區老師及同學,請改由以下路線上下宿舍區

a.國際大樓電梯(5舍至國際大樓步行約10-15分鐘)

b.國際大樓樓梯(5舍至國際大樓步行約10-15分鐘)

c.沿環山二道(5舍至好漢坡公車站步行約12-15分鐘)
※上述時間視步行速度

 

三、未來處理方式及大約執行時間

為確認好漢坡周遭邊坡穩定情形,已於周遭邊坡增設傾度盤進行整體監測,至本年11月,每月監測乙次。除增設傾度盤持續監測外,後續依觀測結果進行邊坡穩定性分析及工法評估。因混凝土牆體自身重量較重,未來改善評估將水泥護欄拆除,並改為裝設不鏽鋼製欄杆。

依觀測及後續施工期間仍需持續封閉樓梯,後續封閉時間再由本處另行公告。

 

四、公車班次說明

113學年度上學期(11399)起實施新班表,上課日增加7班至自強宿舍區的班次如下:

政大2路:由行政大樓至六期運動場 (增加1班次—14:50)

政大3路:由行政大樓至山居學習中心 (增加6班次— 10:1011:1013:1014:1015:1017:10)

 

五、國際大樓後方替代樓梯加強清整

  本區緊鄰邊坡林地,較易產生青苔、落葉,將本區兩側雜木林強剪清空後,以高壓水柱清洗樓梯上泥沙青苔,減少落葉堆積及青苔濕滑的可能。

 

施工期間請注意安全,配合行進路線調整,感謝大家的配合。

 

 

1. Why Haohan Slope is Closed?

The concrete slope stabilization structure at Haohan Slope was observed to have shifted outward in June 2024, increasing the risk of falling rocks. To safeguard pedestrians, Haohan Slope has been temporarily closed for assessment, maintenance, and the development of a comprehensive stabilization plan.

 

2. Current Measures (Lighting enhanced on September 13)

The entrances to Haohan Slope below Zih Ciang Dormitory No. 5 have been closed. Individuals requiring access to the Zih Ciang dormitories or the Downhill Campus are advised to utilize the following alternative routes to and from the dormitory area:

  • The elevator at the International Building: 10-15 minute walk.
  • The stairs in the International Building: 10-15 minute walk.
  • Mountain Circle 2: 12-15 minute walk to Haohan Slope bus stop.
    Time varies based on walking speed.

3. Future Plans

To ensure stability around Haohan Slope, inclinometers have been installed on the surrounding slopes. These devices will be used to monitor and inspect the stability of the slopes on a monthly basis until November 2024. In addition to the installation and monitoring of inclinometers, a further slope stabilization and engineering plan will be developed based on the inspection results. Given the substantial weight of the existing concrete retaining walls, the feasibility of demolishing the current concrete slope stabilization structure and replacing it with a stainless steel guardrail is being considered. Haohan Slope will remain closed throughout the construction period, with the duration of the closure to be announced by the Office of General Affairs at a later date.

 

4. Updated Bus Schedule

Campus bus services will be enhanced starting September 9, 2024. Weekday service frequency will be increased with seven additional departures. The revised schedule is as follows:

  • Route 2 (Administrative Building to Sixth Stadium): One additional departure at 14:50.
  • Route 3 (Administrative Building to Hillside Learning Lodge): Six additional departures at 10:10, 11:10, 13:10, 14:10, 15:10, and 17:10.
     

5. Enhanced cleaning and maintenance of the alternative staircase behind the International Building

Since this area was adjacent to a forested slope, it was prone to moss growth and leaf accumulation. After trimming and clearing the brush and trees on both sides of the area, the stairs were pressure-washed to remove mud, sand, and moss, reducing the buildup of leaves and the potential for slippery moss.

 

Please follow safety guidelines and use alternate routes during the construction period. We appreciate your cooperation.

相關檔案
政大首頁 總務處首頁 iNCCU 網站導覽 English