Show/Hide Right Push Menu漢堡選單漢堡選單漢堡選單
跳到主要內容區塊

訊息公告

首頁 / 訊息公告
::: :::
日期:2026-03-19

一、旨揭工程由「潔光國際股份有限公司」承攬,預定於115320日開工,工期60天,預計518日前竣工。

二、本案進行綜合院館8樓露台遮陽板之拆除作業,將搭設防墜平台,使用吊車至屋頂平台,依區域分段分塊切割拆除遮陽板。

三、施工期程為115320日至518日,施工期間防止墜落,綜院封閉二樓出入口,改由綜合院館一樓進出造成不便,敬請見諒。本公告如有未盡事宜,請電洽連絡人:吳小姐(分機63091)

 

 

The Terrace Canopy Removal Project for the General Building of Colleges will be undertaken by Jie Guang International Co., Ltd. from March 20 to May 18, 2026, with completion expected on or before May 18, 2026.

 

The project includes the dismantling of the canopy on the 8th-floor terrace. A fall-prevention platform will be erected, and a crane will be used on the rooftop to cut and remove the canopy in sections.

 

For safety reasons, the 2nd-floor entrance to the General Building of Colleges will be closed during the construction period. Please use the 1st-floor entrance for access. We apologize for any inconvenience caused and appreciate your understanding and cooperation.

 

For inquiries, please contact Ms. Wu at Ext. 63091.

政大首頁 總務處首頁 iNCCU 網站導覽 English